About Project
The highlight of this project was four 65' to 110' deep concrete lined silo/towers that had to be engineered, formed and placed underground, from the bottom up to the top. The project also included various buildings and large walls.
The highlight of this project was four 65' to 110' deep concrete lined silo/towers that had to be engineered, formed and placed underground, from the bottom up to the top. The project also included various buildings and large walls.